Cockerill Contracting Pty Ltd tendered to repair a gabion wall under the M4. A landslide had caused the cycleway to subside making it untrafficable.
The construction of a gabion wall to support the cycleway from the creek bed up to the cycleway below the M4 required the use of our long arm excavator that has a reach of 12.7m.
Stormwater manhole to be repaired